WORK REPORT ON THE SOFTWARE PROJECT 軟件項目工作報告英語翻譯 From:Dongqiang Huang, Head of Software Department To:Boss Ref:000001 Date:September 1, 2011 The software project I am responsible for currently is the office automation project. The detail is as follow: 1. We have already completed the requirement investigation analysis and summary design, with detail design under way. 2. Each work goes with a swing. We estimate to complete the detail design on the 15th of this month. And then we can carry on software coding. 3. This project’s time is very tight, Everyone is working overtime with all strength. We can finish our work on time. Dongqiang Huang